Sample Acceptance Matrix for Android Device Rollouts

A pass/fail matrix for validating the sample device before production: app behavior, device controls, network assumptions, accessories, packaging and known limitations.

By
Vantora
Published
Updated
Guide
Built around deployment reality

Acceptance means the sample has evidence

A sample should not move to production because it looks close. It should move when the team has reviewed the behaviors that matter to the rollout and recorded pass, fail, conditional or deferred items.

Sample acceptance matrix template

Starter acceptance criteria for a validated Android device sample.
AreaTest itemExpected evidenceStatus options
App readinessInstall, login, core workflow, update path and offline behaviorScreened test run with app version, account role and open issuesPass / Fail / Conditional / Not applicable.
Policy controlsMDM enrollment, allowlist, kiosk, reset path and remote commandsPolicy group record and tested restriction behaviorPass / Fail / Conditional / Not applicable.
Hardware fitDisplay, battery, scan/RFID/camera, sensors, accessories and chargingPilot checklist with runtime, capture results and accessory fit notesPass / Fail / Conditional / Not applicable.
Network and regionSIM/APN, Wi-Fi, radio band assumptions and target-market documentationConnectivity test notes and unresolved certification or carrier itemsPass / Fail / Conditional / Not applicable.
Batch handoffLabels, packaging, serial capture, app version and staging groupStaging record format accepted by customer or partnerPass / Fail / Conditional / Not applicable.

Download the matrix

Use the PDF as a review document during sample testing. The accepted rows should feed the build spec and the known limitations library.

FAQ

What is a conditional acceptance item?

It is an item that can proceed only with a visible dependency or limitation, such as a specific MDM mode, OEM firmware option or target-market certificate still under review.

Who signs off the acceptance matrix?

Usually the customer or partner project owner, the app owner, IT/security and the Vantora solution lead review the matrix before production.

Can the matrix include failed items?

Yes. Failed and deferred rows are useful because they show what must change before production or what is explicitly outside the accepted build.